B2B Portal for Technical and Commercial Foundry Management
Languages

Foundry Corporate News

06. August 2018

OTTO JUNKER: Extension of the melting shop at Messrs. Odlewnia Żeliwa Simiński-Ordon in Poczesna, Poland

OTTO JUNKER: Extension of the melting shop at Messrs. Odlewnia Żeliwa Simiński-Ordon in Poczesna, Poland

Further to the 2 existing melting furnace plants with a capacity of 4,000 kg each, Messrs. Odlewnia Żeliwa Simiński-Ordon (www.odlewy.com) have placed an order with Messrs. Otto Junker GmbH for delivery of two additional melting furnace plants with a capacity of 6,000 kg each and a rated power input of 4,000 kW each, in the economical DUOCONTROL version for melting different cast iron qualities.

In addition to a state-of-the-art IGBT converter for a consistently high cos-phi, the delivery also includes a water recooling system with air / water coolers based on the proven glycol-free principle. In order to facilitate skimming, the furnaces are equipped with a backward tilting unit.

The complete melting process is realized via the new JOKS 4.0 "Touch" operating concept. Commissioning of the furnace plant is scheduled for spring 2019.

Auch verfügbar in Deutsch: OTTO JUNKER: Erweiterung des Schmelzbetriebes bei der Firma Odlewnia Żeliwa Simiński-Ordon in Poczesna, Polen

Youtube Google+ Linkedin Xing